Roof Status
-
Roof Status December 23, 2025
Hale Roofing has completed the work on our roof. Hale will soon be removing the lift vehicle and dumpster. We hope to publish a more comprehensive article in the near future. We don’t have any photographs this time.
-
Roof Status December 17, 2025
Hale Roofing has completed most of the work on our roof.
Hale has made good progress installing the parapet metal sheathing. Hale plans to be done with one more day of work (maybe on Friday Dec 19). See below for photos of the parapet sheathing.
Read more -
Roof Status December 8, 2025
Hale Roofing made further progress today.
Hale has finished installing all of the fully adhered 60 mil reinforced TPO Membrane Roof System on the upper roof deck and walls. Hale still has to do some finish work before the parapet sheathing can be installed. Both roofs should be ready for parapet sheathing fairly soon (weather permitting). The parapet sheathing was delivered to the site today. See photos below.
Read more -
Roof Status December 5, 2025
Hale Roofing made progress this week on our roof in spite of the weather.
Hale has finished installing the “fully adhered 60 mil reinforced TPO Membrane Roof System” on the rest of the 7,900 square foot lower roof. Hale still has to install the metal sheathing over the entire parapet. Hale has installed about half of the TPO Membrane Roof System on the 1,700 square foot upper roof. The photos below show the exposed roof substrate on the upper roof, the steel sheets that are fastened over deteriorated areas of the substrate, and the 1.5” Polyisocyanurate Insulation which is installed on the roof substrate under the TPO Membrane Roof System.
Read more -
Roof Status November 26, 2025
Hale Roofing was able to make further progress this week on our roof. The weather and the Thanksgiving Holiday shortened their time on the roof.
Hale had finished most of the approximately 7,900 square foot lower roof by end of day Wednesday November 26, 2025. See photos below.
Read more -
Roof Status November 21, 2025
Hale Roofing has made good progress this week on our new roof.
They have removed the terra-cotta tiles from the parapet walls and installed wood blocking on the parapet walls. The metal sheathing is yet to be installed on top of the wood. They have also removed all of the old tires from the roof.
Read more